An enhanced method for the determination of the regulation reserves

Aramazd Muzhikyan, Amro M. Farid, Kamal Youcef-Toumi

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

7 Scopus citations

Abstract

Generation reserves are the key resource for balancing power system generation and consumption. Reserves are used to mitigate any imbalances due to uncertainty and variability. However, as a costly commodity, the amount of reserves should be carefully assessed to maintain the cost of power system operations at its minimum. Currently, reserve requirement determination is based upon a posteriori methods that use the experience of power system operators and established assumptions. While these assumptions have been made out of a level of engineering practicality, they may not be formally true given the numerical evidence. The two prequels to this work presented methods for determination of the load following and ramping reserve requirements a priori. This paper now uses a similar methodology to determine the regulation reserve requirement.

Original languageEnglish
Title of host publicationACC 2015 - 2015 American Control Conference
Pages1016-1022
Number of pages7
ISBN (Electronic)9781479986842
DOIs
StatePublished - 28 Jul 2015
Event2015 American Control Conference, ACC 2015 - Chicago, United States
Duration: 1 Jul 20153 Jul 2015

Publication series

NameProceedings of the American Control Conference
Volume2015-July
ISSN (Print)0743-1619

Conference

Conference2015 American Control Conference, ACC 2015
Country/TerritoryUnited States
CityChicago
Period1/07/153/07/15

Fingerprint

Dive into the research topics of 'An enhanced method for the determination of the regulation reserves'. Together they form a unique fingerprint.

Cite this