TY - JOUR
T1 - Impacts of high penetration wind generation and demand response on LMPs in day-ahead market
AU - Zhao, Zhechong
AU - Wu, Lei
PY - 2014/1
Y1 - 2014/1
N2 - Environmental issues in power systems operation lead to a rapid deployment of renewable wind generations. Wind generation is usually given the highest priority by assigning zero or negative energy bidding prices in the day-ahead power market, in order to effectively utilize available wind energy. However, when congestions occur, negative wind bidding prices would aggravate negative locational marginal prices (LMPs) in certain locations. The paper determines the proper amount of demand response (DR) load to be shifted from peak hours to off peaks under the Independent System Operator's (ISO) direct load control, for alleviating transmission congestions and enhancing the utilization of wind generation. The proposed mixed-integer linear programming (MILP) model is to minimize the total operation cost while incorporating explicit LMP formulations and non-negative LMP requirements into the network-constrained unit commitment (NCUC) problem, which are derived from the Karush-Kuhn-Tucker (KKT) optimality conditions of the economic dispatch (ED) problem. Numerical case studies illustrate the effectiveness of the proposed model.
AB - Environmental issues in power systems operation lead to a rapid deployment of renewable wind generations. Wind generation is usually given the highest priority by assigning zero or negative energy bidding prices in the day-ahead power market, in order to effectively utilize available wind energy. However, when congestions occur, negative wind bidding prices would aggravate negative locational marginal prices (LMPs) in certain locations. The paper determines the proper amount of demand response (DR) load to be shifted from peak hours to off peaks under the Independent System Operator's (ISO) direct load control, for alleviating transmission congestions and enhancing the utilization of wind generation. The proposed mixed-integer linear programming (MILP) model is to minimize the total operation cost while incorporating explicit LMP formulations and non-negative LMP requirements into the network-constrained unit commitment (NCUC) problem, which are derived from the Karush-Kuhn-Tucker (KKT) optimality conditions of the economic dispatch (ED) problem. Numerical case studies illustrate the effectiveness of the proposed model.
KW - Demand response
KW - KKT
KW - LMP
KW - NCUC
KW - load shifting
KW - wind generation
UR - http://www.scopus.com/inward/record.url?scp=84892575599&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84892575599&partnerID=8YFLogxK
U2 - 10.1109/TSG.2013.2274159
DO - 10.1109/TSG.2013.2274159
M3 - Article
AN - SCOPUS:84892575599
SN - 1949-3053
VL - 5
SP - 220
EP - 229
JO - IEEE Transactions on Smart Grid
JF - IEEE Transactions on Smart Grid
IS - 1
M1 - 6575188
ER -