Stress Distributions in Girder-Arch-Pier Connections of Long-Span Continuous Rigid Frame Arch Railway Bridges

Hongye Gou, Hao Long, Yi Bao, Genda Chen, Qianhui Pu, Rui Kang

Research output: Contribution to journalArticlepeer-review

47 Scopus citations

Abstract

Because of their large stiffness and spanning capability, continuous rigid frame arch bridges are attracting increasing interest in the development of high-speed railway networks in China. The internal loadings are associated with both the continuous rigid frame and arch substructural systems. Thus, the bridges are subjected to complex stresses, in particular, at the girder-arch-pier connections. The evaluation of the mechanical performance and understanding of the stress distribution of the girder-arch-pier connection are critical for ensuring the effective design and condition assessment of the bridges. This paper investigates the stress distributions in the girder-arch-pier connections of the world's longest continuous rigid frame arch railway bridge, the Yichang Yangtze River Bridge. Two models with a length scale of 1/10 were prepared and tested for the side-span and midspan girder-arch-pier connections, respectively. Detailed stress distributions in the connection models were measured, and three-dimensional finite-element models were established to help understand the measured stress distributions. The side-span and midspan connections are primarily in compression and have similar stress distributions.

Original languageEnglish
Article number04018039
JournalJournal of Bridge Engineering
Volume23
Issue number7
DOIs
StatePublished - 1 Jul 2018

Keywords

  • Continuous rigid frame arch bridge
  • Girder-arch-pier connections
  • Model test
  • Railway bridge
  • Strain distribution

Fingerprint

Dive into the research topics of 'Stress Distributions in Girder-Arch-Pier Connections of Long-Span Continuous Rigid Frame Arch Railway Bridges'. Together they form a unique fingerprint.