N2 - Because of their large stiffness and spanning capability, continuous rigid frame arch bridges are attracting increasing interest in the development of high-speed railway networks in China. The internal loadings are associated with both the continuous rigid frame and arch substructural systems. Thus, the bridges are subjected to complex stresses, in particular, at the girder-arch-pier connections. The evaluation of the mechanical performance and understanding of the stress distribution of the girder-arch-pier connection are critical for ensuring the effective design and condition assessment of the bridges. This paper investigates the stress distributions in the girder-arch-pier connections of the world's longest continuous rigid frame arch railway bridge, the Yichang Yangtze River Bridge. Two models with a length scale of 1/10 were prepared and tested for the side-span and midspan girder-arch-pier connections, respectively. Detailed stress distributions in the connection models were measured, and three-dimensional finite-element models were established to help understand the measured stress distributions. The side-span and midspan connections are primarily in compression and have similar stress distributions.
AB - Because of their large stiffness and spanning capability, continuous rigid frame arch bridges are attracting increasing interest in the development of high-speed railway networks in China. The internal loadings are associated with both the continuous rigid frame and arch substructural systems. Thus, the bridges are subjected to complex stresses, in particular, at the girder-arch-pier connections. The evaluation of the mechanical performance and understanding of the stress distribution of the girder-arch-pier connection are critical for ensuring the effective design and condition assessment of the bridges. This paper investigates the stress distributions in the girder-arch-pier connections of the world's longest continuous rigid frame arch railway bridge, the Yichang Yangtze River Bridge. Two models with a length scale of 1/10 were prepared and tested for the side-span and midspan girder-arch-pier connections, respectively. Detailed stress distributions in the connection models were measured, and three-dimensional finite-element models were established to help understand the measured stress distributions. The side-span and midspan connections are primarily in compression and have similar stress distributions.
KW - Continuous rigid frame arch bridge
KW - Girder-arch-pier connections
KW - Model test
KW - Railway bridge
KW - Strain distribution
UR - http://www.scopus.com/inward/record.url?scp=85046041673&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85046041673&partnerID=8YFLogxK
U2 - 10.1061/(ASCE)BE.1943-5592.0001250
DO - 10.1061/(ASCE)BE.1943-5592.0001250
M3 - Article
AN - SCOPUS:85046041673
SN - 1084-0702
VL - 23
JO - Journal of Bridge Engineering
JF - Journal of Bridge Engineering
IS - 7
M1 - 04018039
ER -