Abstract
In recognizing significant advantages in achieving carbon emission reduction and mitigating variability of renewables, an increasing installation of combined-cycle (CC) units has been observed recently. This new shift in the generation portfolio has urged Independent System Operators (ISO) to continuously enhance CC unit models in their unit commitment (UC) tools, in order to derive physically feasible and operationally reliable unit commitment and generation dispatch schedules of CC units by accurately capturing their operation features. To this end, this paper accurately simulates startup and shutdown processes of individual turbines of a CC unit during the configuration transition procedure. A dynamic ramping model and the corresponding spinning reserve model for individual turbines are also proposed to further enhance the modeling accuracy. A modified IEEE 118-bus system with multiple CC units is adopted to evaluate the proposed models.
| Original language | English |
|---|---|
| Article number | 8897502 |
| Pages (from-to) | 2200-2211 |
| Number of pages | 12 |
| Journal | IEEE Transactions on Power Systems |
| Volume | 35 |
| Issue number | 3 |
| DOIs | |
| State | Published - May 2020 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Combined-cycle unit
- configuration transition
- dynamic ramping
- unit commitment
Fingerprint
Dive into the research topics of 'Towards Accurate Modeling on Configuration Transitions and Dynamic Ramping of Combined-Cycle Units in UC Problems'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver